Danby DKC644BLS Owner's Manual Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 21
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
ASSEMBLY INSTRUCTIONS (CONT'D)
14. Installation of the Keg Coupler: IMPORTANT
NOTICE; Make sure the pull handle of the
keg coupler is in the "upward" (closed) position
before installingon the beer keg. See Fig. 8 Insert
the keg coupler into the locking neck of the beer
keg and apply a 1/4 turn clockwise to lock into
position.
15. InstaUation of the CO 2 Air Line Hose to the
Keg Coupler: Attach the open end of the (red) air
line hose to the hose barb connection on the keg
coupler. Secure hose by using the remaining (self
locking) plastic snap on clamp provided. (use pliers
to tighten clamp and assure there are no leaks)
16. Instaflation of the Beer Line Hose to the Keg
Coupler: Screw the beer line nut onto the keg
coupler and hand tighten firmly. IMPORTANT
NOTICE: The black rubber washer provided must be
installed inside the beer line connection nut before
connecting the beer line to the keg coupler.
17. Making the connection between the Keg
Coupler and Beer Keg: Before making (opening)
connection between the keg coupler and beer keg,
make sure the beer tower faucet is in the closed
position. (faucet handle straight back) To engage
the tank connection, pull the keg coupler handle
out and push down until it locks into position.
Listen for positive "click" of the pull handle in the
final downward position. See Fig. 9
18.
Opening the CO 2 Cylinder Main Valve: Before
opening the main valve located on top of the CO 2
cylinder. Make sure the "secondary" shut-off valve
located on the lower stem pipe of the regulator is
in the "closed" position. See Fig. 10
NOTE: When the secondary valve (handle) is posi-
tioned "Horizontal" (east/west) the valve is closed.
When the secondary valve (handle) is positioned
"Vertical" (north/south) the valve is open. To open the
main CO2 cylinder valve, (slowly) turn the main valve
counter clockwise until fully open. You will notice the
needles on both gauges start to climb.
19.
Adjusting the CO 2 Regulator: There are two
pressure gauges on the CO2 regulator.
See Fig. 12 The upper gauge #1 monitors "LOW"
(internal keg) pressure and must be adjusted to
the correct operating pressu re of 10-12psHbs. The
lower gauge #2 monitors "HIGH" (CO 2 cylinder)
pressure and is not adjustable. The high pressure
gauge also acts as a fuel gauge to let you know
when the C02 cylinder needs re-filling.
IMPORTANT: The internal operating pressure of the
beer keg should be adjusted and maintained between
10 - 12psi/Ibs. To adjust the "low" pressure gauge;
Using an adjustable wrench, release the adjustment
lock nut # 3. See Fig. 11
- Using a flat screwdriver, turn the regulator adjustment
screw # 4 See Fig. 11 Clockwise rotation of the
adjustment screw will increase low pressure. Counter
clockwise rotation of the adjustment screw will
decrease low pressure
When the required operating pressure is attained
retighten the adjustment lock nut # 3.
You are now ready to serve cold beer
Fig. 8 Fig. 9
Secondary
Valve
Fig. 10
4
6
Fig. 11
12
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 20 21

Comments to this Manuals

No comments