NORMAL INSTALLATION STEPS
1. Before Starting
PARTS INCLUDED TOOLS YOU WILL NEED
• Anti-Tip bracket
• Anchor sleeves
• Bolts
For leveling legs and Anti-tip bracket:
• Adjustable wrench or channel lock pliers
• Electric or hand drill
• Wood floors: 3/16” drill bit
• Concrete/ceramic floors: 13/32” carbide-tipped masonry drill bit
• 3/8” nut driver
For gas supply connection:
• Pipe wrench
For burner flame adjustment:
• Phillips head and blade-type screwdrivers
For gas conversion (LP/Propane or Natural)
• Open end wrench – ½”
Additional materials you will need:
• Gas line shut-off valve
• Pipe joint sealant that resist action of LP/Propane gas
• A new flexible metal appliance conduit (½” NPT x ¾” or ½” I.D.) must be design certified
by CSA International. Because solid pipe restricts moving the range we recommend using
a new flexible conduit (4 to 5 foot length) for each new installation and additional
reinstallations
• Always use the 2 new flare union adapters (½” NPT x ¾” or ½” I.D.) supplied with the new
flexible appliance conduit connection of the range.
• Tape measure
• Safety glasses
• Pencil
• Level
• Hammer (may be needed for anchors)
Comments to this Manuals